Work orders
Work orders prepared by Mining Institute, MUST
(1970-2014 )
№ |
Work title |
Date prepared Executives, engineers |
Result |
1 |
Project statement for equipment renovation at Nalaikh colliery. |
ULAANBAATAR. 1970 . Chief engineer: Rojkov N.A., engineers P.Chimed, G.Rentsendorj, Ts.Erdenejav, B.Dashzeveg, M.Dondog, D.Tumurbaatar, Pustovaya G.Ya., Alyoshin Yu.M., Burkovskii I.A., Kuznetsov B.N., Volodenkov L.A., D.Buriad, D.Dashnamjil, B.Lhagvasuren. |
Boundaries, reserves, production and mining conditions of Nalaikh colliery were analyzed. Subjects to renovate mine opening, shafts, mining method, mine transportation, back-filling, ventilation, dewatering, water supply, power supply, heat supply, planning of surface facilities were determined. Economics for renovation were calculated. |
2 |
Work order to produce the Feasibility study to develop the Uvdugkhudag coal deposit by surface mining method, Mongolian Peoples Republic. |
ULAANBAATAR. 1971 . Engineers G.Tserendorj, Ya.Gombosuren, Mujaan, Khishigdorj, Bat-Erdene, Ch.Gombosuren, Surahbayar, D.Batjargal and Soviet specialists. |
Work order to produce Feasibility study for Uvdugkhudag coal mine was prepared in cooperation with Giproshaht Institute, Leningrad, USSR. |
3 |
Work order to produce Feasibilty study to handle the Baganuur coal using energy technology. |
ULAANBAATAR. 1981 . Prepared by ХТБС. |
Work order to produce Feasibilty study to handle the Baganuur coal using energy technology was prepared. |
4 |
Work order to establish the operative control sub-system for coal sector. |
ULAANBAATAR. 1986 . Engineers G.Dorj, S.Idermaa. |
Work order to establish the operative control sub-system for coal sector was developed. |
5 |
Final report of research to prepare the Terms of Refernce for the Feasibility study for Baganuur coal mine. |
ULAANBAATAR. 2014 . Project executive Kh.Jargalsaikhan, engineers Kh.Jargalsaikhan, B.Purevtogtokh, G.Tulga, Ya.Deriilaamyatav, O.Tsevegsuren, G.Tuvaansuren, Ch.Oyundelger. |
"FINAL REPORT. Preparation of Terms of Reference of the Feasibility Study for extension of Coal Mine Baga nuur". REP No WB/MOF/MINIS/CS/CQS/1.1.9(a)2013; Credit No 4888-ТИ (A Project to Support the Infrastructure in the Mining Sector). |
6 |
Work order for the extension Baganuur coal mine Feasibilty Study. (A Project to Support the Infrastructure in the Mining Sector). |
ULAANBAATAR. 2014 . Project executive Kh.Jargalsaikhan, engineers Kh.Jargalsaikhan, B.Purevtogtokh, G.Tulga, Ya.Deriilaamyatav, O.Tsevegsuren, G.Tuvaansuren, Ch.Oyundelger. |
Work order for the extension of Baganuur coal mine Feasibilty Study was developed. |
7 |
Work order to perform additional (in-mine) exploration. (A Project to Support the Infrastructure in the Mining Sector). |
ULAANBAATAR. 2014 . Project executive Kh.Jargalsaikhan, engineers Kh.Jargalsaikhan, B.Purevtogtokh, G.Tulga, Ya.Deriilaamyatav, O.Tsevegsuren, G.Tuvaansuren, Ch.Oyundelger. |
Scope of work for in-mine exploration containing volumes, requirements and cost estimations was developed. |