Work orders

Work orders prepared by Mining Institute, MUST

(1970-2014 )

Work title

Date prepared

Executives, engineers

Result

1

Project statement for equipment renovation at Nalaikh colliery.

ULAANBAATAR. 1970 .

Chief engineer:  Rojkov N.A., engineers P.Chimed, G.Rentsendorj, Ts.Erdenejav, B.Dashzeveg, M.Dondog, D.Tumurbaatar, Pustovaya G.Ya., Alyoshin Yu.M., Burkovskii I.A., Kuznetsov B.N., Volodenkov L.A., D.Buriad, D.Dashnamjil, B.Lhagvasuren.

Boundaries, reserves, production and mining conditions of Nalaikh colliery were analyzed. Subjects to renovate mine opening, shafts, mining method, mine transportation, back-filling, ventilation, dewatering, water supply, power supply, heat supply, planning of surface facilities were determined. Economics for renovation were  calculated.

2

Work order to produce the Feasibility study to develop the Uvdugkhudag coal deposit by surface mining method, Mongolian Peoples Republic.

ULAANBAATAR. 1971 .

Engineers G.Tserendorj, Ya.Gombosuren, Mujaan, Khishigdorj, Bat-Erdene, Ch.Gombosuren, Surahbayar, D.Batjargal and Soviet specialists.

Work order to produce Feasibility study for Uvdugkhudag coal mine was prepared in cooperation with Giproshaht Institute, Leningrad, USSR.

3

Work order to produce Feasibilty study to handle the Baganuur coal using energy technology.

ULAANBAATAR. 1981 .

Prepared by ХТБС.

Work order to produce Feasibilty study to handle the Baganuur coal using energy technology was prepared.

4

Work order to establish the operative control sub-system for coal sector.

ULAANBAATAR. 1986 .

Engineers G.Dorj, S.Idermaa.

Work order to establish the operative control sub-system for coal sector was developed.

5

Final report of research to prepare the Terms of Refernce for the Feasibility study for Baganuur coal mine.

ULAANBAATAR. 2014 .

Project executive Kh.Jargalsaikhan, engineers Kh.Jargalsaikhan, B.Purevtogtokh, G.Tulga, Ya.Deriilaamyatav, O.Tsevegsuren, G.Tuvaansuren, Ch.Oyundelger.

"FINAL REPORT. Preparation of Terms of Reference of the Feasibility Study for extension of Coal Mine Baga nuur". REP No WB/MOF/MINIS/CS/CQS/1.1.9(a)2013; Credit No 4888-ТИ  (A Project to Support the Infrastructure in the Mining Sector).

6

Work order for the extension Baganuur coal mine Feasibilty Study. (A Project to Support the Infrastructure in the Mining Sector).

ULAANBAATAR. 2014 .

Project executive Kh.Jargalsaikhan, engineers Kh.Jargalsaikhan, B.Purevtogtokh, G.Tulga, Ya.Deriilaamyatav, O.Tsevegsuren, G.Tuvaansuren, Ch.Oyundelger.

Work order for the extension of Baganuur coal mine Feasibilty Study was developed.

7

Work order to perform additional (in-mine) exploration. (A Project to Support the Infrastructure in the Mining Sector).

ULAANBAATAR. 2014 .

Project executive Kh.Jargalsaikhan, engineers Kh.Jargalsaikhan, B.Purevtogtokh, G.Tulga, Ya.Deriilaamyatav, O.Tsevegsuren, G.Tuvaansuren, Ch.Oyundelger.

Scope of work for in-mine exploration containing volumes, requirements and cost estimations was developed.